Arkpro

  • Home
  • Contact
  • Home
  • Contact
Picture
CASE STUDY
Braunton Primary School
The Fast-Track nature of ARKPRO building enabled this school project to meet a tight construction program.

Picture
CASE STUDY
Passivhaus Office Building
CPMG Architects and Interserve built a new office building in Leicestershire that met Passivhaus standards.
Picture
CASE STUDY
​Bryncethin School
​ARKPRO was predominantly chosen for its thermal resistance and acoustic properties.
Picture
CASE STUDY
Housing Association, Brig-Y-Coed
The use of ARKPRO enabled this scheme to easily meet sustainability and energy efficiency targets. 
Picture
CASE STUDY
Residential Development, Brighton
​Constructed through poor weather conditions as ARKPRO can be constructed in all weather conditions.
Picture
CASE STUDY
Residential Care Home
Fast track build for a residential care home in Yorkshire, finished in render and brickwork to match.

Picture
CASE STUDY
Self Build, Wokingham
A contemporary self build project in Wokingham, Surrey. Finished in render and clay clockwork tiles.

Picture
CASE STUDY
Residential Development, Sheffield
An extended refurbishment of old industrial buildings finished with reclaimed brick slips to blend seamlessly with the original building surroundings.

Contact  |  The ARKPRO System
Call us on 0330 3211627 (local rate), Monday to Friday 8.30am until 6pm
(c) 2020 All Rights Reserved
​ARKPRO  Building Systems Ltd